Mersin and Bilkent City Hospitals by CCN Technic and PPP model provide;
• Building and Land Services
• Extraordinary Maintenance and RepairServices,
• Common Services,
• Technical Facility Management Services that also include ground and garden maintenance services are provided in accordance with all high standards on management of technical infrastructure and maintenance.
CCN Technic takes its strength in the services it offers from engineering and contracting services, qualified personnel and management staff, continuous calibration studies, business and budget planning expertise, continuous training, ability to analyze corporate software and inventory management capabilities and planned work and work safety training.
• Within framework of 181,50 mvA Total Electric Power and 88.75 mvA Demand Electric Power; 32 Generators, 175 UPS, 21.2 MW Trigenic Plant, 957 Tons Liquid Fuel Tank
• Within the framework of 114,50 MW cooling and 97,6 MW heating capacity; 15 Chiller, 31 Cooling Tower, 12 Hot Water Boiler, 4 Sterile Steam Boiler, 2 Raw Steam Boiler, 754 Air Handling Units, 212 Precision Controlled Air Conditioners, 13.750 Fan Coils, 370 Humidification Units, 182 Operating Rooms Laminar Flow Units.
• All Intensive Care, Sterilization Unit, Laboratory, Isolation Rooms, Angiography Units and Operating Room HEPA Filters.
• Fire Extinguishing System Electric and Diesel Pumps, Extinguishing Equipment, It is ensured that planned and continuous tests of Fire Detection System, Lifts and Escalators and HEPA Filtered Systems are carried out within the framework of legal obligations and are being monitored continuously through the related software. Thus, necessary arrangements are performed before the scheduled maintenance and replacement periods in case of need.
• Lifting systems green labels are repeated once a year, validation tests are repeated once in every 6 months. All filter changes are monitored at differential pressure from the BMS System and changes are provided at the right times.
• 287 elevators, 40 Escalators, 4 moving walkways.
• Building and Land Services
• Extraordinary Maintenance and RepairServices,
• Common Services,
• Technical Facility Management Services that also include ground and garden maintenance services are provided in accordance with all high standards on management of technical infrastructure and maintenance.
CCN Technic takes its strength in the services it offers from engineering and contracting services, qualified personnel and management staff, continuous calibration studies, business and budget planning expertise, continuous training, ability to analyze corporate software and inventory management capabilities and planned work and work safety training.
• Within framework of 181,50 mvA Total Electric Power and 88.75 mvA Demand Electric Power; 32 Generators, 175 UPS, 21.2 MW Trigenic Plant, 957 Tons Liquid Fuel Tank
• Within the framework of 114,50 MW cooling and 97,6 MW heating capacity; 15 Chiller, 31 Cooling Tower, 12 Hot Water Boiler, 4 Sterile Steam Boiler, 2 Raw Steam Boiler, 754 Air Handling Units, 212 Precision Controlled Air Conditioners, 13.750 Fan Coils, 370 Humidification Units, 182 Operating Rooms Laminar Flow Units.
• All Intensive Care, Sterilization Unit, Laboratory, Isolation Rooms, Angiography Units and Operating Room HEPA Filters.
• Fire Extinguishing System Electric and Diesel Pumps, Extinguishing Equipment, It is ensured that planned and continuous tests of Fire Detection System, Lifts and Escalators and HEPA Filtered Systems are carried out within the framework of legal obligations and are being monitored continuously through the related software. Thus, necessary arrangements are performed before the scheduled maintenance and replacement periods in case of need.
• Lifting systems green labels are repeated once a year, validation tests are repeated once in every 6 months. All filter changes are monitored at differential pressure from the BMS System and changes are provided at the right times.
• 287 elevators, 40 Escalators, 4 moving walkways.